Plan the build; execution waits for required materials and controls.
Check existing supply before requesting the uncovered balance.
Submitted evidence does not clear pending checks or open blockers.
Example stages- Planning · current
- Assembly
- Quality
- Dispatch
Linked jobPlanningStock / purchasingRelease checks Illustrative assembly · Not an engineering drawing01 / Order contextPlan before production.
- Current stage
- Planning
- Material issue
- Not started
- Release checks
- Requirements unresolved
The build stays in planning while its material and control requirements are unresolved.
02 / Material readinessBill of Materials (BOM)
Frame members · m
- Required
- 48 m
- Usable
- 16 m
- On order
- 12 m
- To procure
- 20 m
Fixing kit · ea
- Required
- 1 ea
- Usable
- 1 ea
- On order
- 0 ea
- To procure
- 0 ea
Usable includes this order’s reservations: 8 m + 1 ea. Nothing issued.
PR-000018 → PUR-000014 · 12 m counted once, not yet received.
03 / Release requirementsChecks before release.
- Drawing reviewDimensions recorded
- Pending inspection
- Build briefRequired operational form
- Submitted
- Fixing detailBlocking defect
- Open
Release blocked: complete the inspection and resolve the open defect.
⊣Planning only. Materials must be issued; configured checks still apply.
Illustrative production order · Example data
01 / ContextProduction in context
Follow each production order through your configured stages, with its job and target dates close at hand.
02 / MaterialsMaterial readiness
See required materials, available stock and existing purchasing before raising another request.
03 / QualityQuality before release
Keep inspections, evidence and configured release requirements connected to the production order.